Videos

Unconventional Transportation Videos

Five axles Live Hydraulic Gooseneck crossing Gumma Bypass constructed by Upper India Carriers carrying 84 MT Transformer
Five axles Live Hydraulic trailer Gooseneck negotiating hairpin bends of Gumma
Tailor made Hydraulic Tilting arrangement system and counter weight for CG management made by Upper India Carriers for 6 meters wide cutter bearing of Tunnel Boring Machine to cross 5 meters wide bridge (HCC Ltd.)
Tilting mechanism fabricated to transport bogie frame – marginal movement
Inhouse winch mechanism developed by Upper India Carriers for winching of a transformer at Tiplyang Bridge in Nepal
Weight distribution and winching of 122 MT transformer at Solding Khud bridge in Wangtoo, Himachal
Transportation of Transformer on a tailor made solution trailer for PGCIL (Legship, Sikkim)
Bridge strengthening undertaken by Upper India Carriers for transportation of transformer in Nepal